In June 2010, Glansbeton worked on a concrete floor inside the then Sportpaleis in Antwerp. The concert hall has been called AFAS Dome since 2025. Our own photos show the site as it was then: a large hall, reinforcement meshes, workers and concrete trucks inside the building.
Antwerp
June 2010
Concrete floor in the event hall
A concrete floor inside a large event hall
For a site of this scale, accessibility partly determines how the concrete can be delivered. The photos show concrete mixers and site vehicles inside the hall. The location of the pouring zone and the free space around the working team are also important to properly distribute the fresh concrete.


From reinforcement meshes to fresh concrete
In the site images, you can see the floor being constructed. The reinforcement meshes are ready, and the concrete is delivered and poured. An employee guides the concrete flow and distributes the mixture over the work area. Such moments require good coordination between delivery, placement, and further finishing.


The Sportpaleis is now AFAS Dome
The recognisable hall in these photos was called Sportpaleis Antwerpen during our works. Since 1 September 2025 it has been named AFAS Dome. The images document our concrete works in 2010; they do not show later renovations of the hall.

A concrete floor for a large building?
Tell us how the space will be used and how the concrete can be delivered on site. With a plan and a short site video, we can discuss the execution in a targeted way.
Discuss your project
Concrete floor in the Sportpaleis Antwerpen, now AFAS Dome